Sahara · for post-micturition dribble

The Full-Stop Protocol.

A twelve-week training program for post-micturition dribble: the drops that arrive after a man thinks he has finished. Two minutes, three times a day, guided by an app nobody can tell he is using.

Take the 2-minute assessmentFree. Eight questions, then your plan.
Trial-basedthe protocol from a 12-week randomised trial
Discreetnothing to wear, nothing anyone can see
Free to start21 days free on the annual plan, then $149 a year
The Sahara app: today's sessions and the fourteen-day ring
It has a name

Common, undramatic, and almost never treated.

Post-micturition dribble is not dangerous and there is no pill for it, so it sits outside the system. Most men who ask are told it is age, or the prostate.

17%

of adult men have it. Not rare. Not talked about.

General-population survey.
1 in 4

by their fifties. 11% in their twenties, so it is not simply age.

Same survey, by decade: 11 · 13 · 19 · 27%.
“Outside of physicians' and researchers' interests.”

How a medical review described the condition.

Medical review, 2019.
What is actually happening

Not the prostate. One muscle.

After urination a small amount stays in the urethra. A muscle at the base of the pelvis, the bulbocavernosus, normally squeezes it out; the medical word is “milking”. When that muscle fires late or weakly, the last of it leaks out on its own a moment later. Muscles that weaken from disuse respond to training.

WorkingFinish · the muscle squeezes the urethra empty · dry
Not workingFinish · the muscle fires late · a few drops a moment later
TrainedFinish · the clean-up squeeze happens on its own again · dry
The evidence

75% of men were symptom-free after six months of training.

In a randomised controlled trial, men with post-micturition dribble trained the pelvic floor, three months supervised and three at home. Minutes a day, no equipment, invisible to everyone around them.

75%week 12
Trained daily. Symptom-free, not improved.
Still had symptoms at six months. The advice-only group was clearly behind at three months.
Randomised controlled trial, 2004: men with post-micturition dribble trained the pelvic floor, three months supervised then three at home; 75% were asymptomatic at the end.
4 → 7

The man who built Sahara had it for years. He started at a 4 out of 10 and logged two 7s in a row by day fourteen, his best in years. Individual results vary; the app shows each man his own numbers.

The program

Twelve weeks, two minutes at a time.

Three sessions a day, phone in the pocket, vibration cues so there is nothing to look at. One tap a day rates the day from 1 to 10, and day fourteen is the first checkpoint: the first rating next to the latest one.

Weeks 1–2

Foundation

Find the muscle lying down, knees bent. Hold it, then let it go fully. Short holds to start.

Weeks 3–6

Build

Holds get longer, then standing, then walking. This is where most men see their number move.

Weeks 7–12

Automatic

The clean-up squeeze after finishing becomes reflex. Maintenance is two sessions a week.

A guided session in the Sahara app
Guided sessions: squeeze, hold, release, counted for you.
Today screen with the fourteen-day ring
The fourteen-day challenge ring and three sessions a day.
Progress charts in the Sahara app
The rating over time and the habit grid.
The one-tap daily check-in
One tap a day. That is the whole check-in.
What it costs

Start free for 21 days.

The assessment is free and takes two minutes. The plan it builds runs in the Sahara app for Android, with iPhone next. Nothing to wear, nothing to install in the bathroom, and the charge on the statement reads SAHARA HEALTH.

21 days free
$12.42a month on the annual plan, billed $149 a year after a free 21-day trial. Or $15 a month, no trial.
  • The full twelve-week program
  • Guided sessions, daily check-in, the day-14 result
  • Cancel online in one click, any time
  • 30-day money-back guarantee, no questions
Take the 2-minute assessment
Questions

Is this medical treatment?

No. It is training: the exercises a pelvic-floor physiotherapist would prescribe, guided by an app. See a clinician for pain, blood in urine, or any sudden change, and follow their advice over ours.

Will anyone know?

No. There is nothing to wear, no social features, the reminders never say what they are for, and the app icon is a plain mark.

What if it is the prostate?

An enlarged prostate can cause other symptoms, and a clinician can check it. After-dribble itself is the muscle, which is why prostate treatment rarely changes it.

How long until something changes?

Most men notice between week two and week four. The app measures from day one, so the change is visible before it is obvious.

What does the assessment ask?

Eight questions: what has been noticed, how often, how long it has been going on, and what it has cost you. Nobody sees the answers, and they are only processed with consent.

How do I cancel?

One click on the account page. Cancelling stops future charges; access runs to the end of the paid period.

Start training the muscle this week.

Eight questions, two minutes, and you get your plan. Free.

Take the 2-minute assessment